Placing and tying reinforcement to slabs, columns, walls, cores and beams on major projects across the UK. Our carded gangs fix the steel accurately to the engineer’s drawings, with covers, laps and spacers right first time, and present each pour clean and ready for inspection.

Suspended slabs and decks fixed to drawings, with top and bottom mats, chairs and spacers set for correct cover.
Vertical cages, wall reinforcement and lift cores tied plumb and true, ready for shuttering.
Beam cages, ground beams and stair reinforcement fixed neat around congested connections.
Every cage presented clean for the engineer, with laps, links and covers checked before the pour.
We mobilise carded gangs to major project sites nationwide. A few of the cities we cover:
Yes. We work directly from your structural drawings and bar bending schedules, and fix everything to BS 4449 / BS 8666 with the correct covers, laps and spacers. Each pour is presented clean for your engineer or building control to sign off before concrete goes in.
Both. We are happy to fix reinforcement you have already procured, or take on supply and fix as a single package so there is one team accountable for the whole reinforcement job.
Slabs, columns, walls, lift and stair cores, beams, ground beams, pile caps and rafts, across high-rise residential, commercial, mixed-use and civil schemes.
We size the gang to your pour sequence and programme, and ramp up numbers when the frame demands it so reinforcement never becomes the thing holding up the pour.
Send us the drawings and programme and we will come back to you.
Tell us the project, programme and scope, and whether you need supply, fix or both. We will come back to you.