Glasgow’s Clyde waterfront and city-centre schemes make central Scotland part of the ground we cover. We supply and fix reinforcement for reinforced-concrete frames, substructures and civils on major projects in Glasgow, delivered to programme by carded steel-fixing gangs.
Also nearby: Edinburgh · Newcastle · Liverpool

Working from your engineer’s drawings, we take on reinforcement across city-centre residential frames, commercial and riverside substructures in Glasgow, from bar bending schedules and cut and bend supply through to fully fixed cages presented clean for inspection.
Placing and tying reinforcement to slabs, columns, walls, cores and beams on major projects across the UK.
S/02Cut and bend reinforcement supplied to BS 8666, with bar bending schedules prepared from your drawings and deliveries phased to suit your pour sequence.
S/03Reinforcement to cores, columns, slabs and stairs for reinforced-concrete frames on high-rise, commercial and residential structures.
S/04Reinforcement to foundations, rafts, pile caps, ground beams and basements, getting the structure right below ground before the frame goes up.
S/05Mechanical splicing and rebar couplers for continuity at construction joints, kickers and heavily congested connections.
S/06Carded steel-fixing gangs supplied to your site, resourced to the programme and managed by experienced supervisors.
In and around Glasgow (G1) we work on city-centre residential frames, commercial and riverside substructures. From cut and bend supply to fully fixed cages, we take on the reinforcement package for main contractors and developers building near Clyde waterfront.
Yes. We mobilise carded steel-fixing gangs to Glasgow, resourced to your programme and run by experienced supervisors. Whether you need a supervised gang or extra fixers under your own supervision, we can cover it.
Yes. We can schedule and supply cut and bend reinforcement to BS 8666 and fix it to your drawings as a single package, so there is one team accountable for reinforcement on your Glasgow project.
It depends on the scale of the package and what else we have running, but we resource to your programme and ramp gangs up as the frame demands. Glasgow’s Clyde waterfront and city-centre schemes make central Scotland part of the ground we cover. Send us the programme and we will tell you what we can commit to.
Yes. That is exactly the kind of work we take on in Glasgow. We fix reinforcement to BS 4449 / BS 8666 and present each pour clean for inspection, working alongside your groundworks, concrete and formwork packages.
Send us the drawings and programme and we will come back to you.
Tell us the project, programme and scope, and whether you need supply, fix or both. We will come back to you.